The scope baseline consists of the scope statement and the work breakdown structure (WBS). Describe the relationship between the scope statement and the WBS and why they are fundamental to project success. Your response should be at least 200 words in length. Explain how the triple constraints of scope, schedule, and cost play an integral role in managing a successful project.Your response should be at least 200 words in length.

Assessment (STUDY GUIDE ATTACHED) APA FORMAT
$ 50.00
The scope baseline consists of the scope statement and the work breakdown structure (WBS). Describe the relationship be